31-year-old woman spends 40 of the last 52 weekends at her boyfriend’s parents’, house, refuses to continue but gets guilt-tripped: 'I just want my weekends back'

Advertisement
  • A frustrated woman sits on the bed looking away while a man beside her looks down.
  • I have spent roughly 40 of the last 52 weekends at my boyfriend's parents' house. I counted because I needed to be sure I wasn't dramatizing before opening my mouth.
  • We've been together for three years and somewhere around month fourteen this just became the standing plan without anyone officially deciding it: Friday evening, drive 45 minutes out, eat dinner with his parents, watch something on TV, sleep there, spend Saturday doing whatever his mom has planned, drive home Sunday afternoon.
    via Nov4Z3nith
  • His parents are genuinely warm people and I have nothing against them personally. But I am 31 years old and I have my own life happening in the city: friends I haven't seen properly in months, a spare room I've been meaning to sort out since February, Saturday mornings I'd love to spend at the farmers market near my building instead of sitting in someone else's living room making small talk.
    via Nov4Z3nith
  • I raised it carefully about two months ago, framed it as a personal need rather than a complaint.
    via Nov4Z3nith
  • I said I'd love to visit every other weekend, maybe once a month during busy periodes, and that the current frequency was slowly draining me.
    via Nov4Z3nith
  • He seemed to hear it. I thought we were good. We were not good. The pace slowed for maybe three weekends and then quietly returned to exactly what it was before, usually through loose plans that somehow always resolved into the same drive out of the city.
    via Nov4Z3nith
  • Last week I said clearly that I wasn't going and wanted to stay home, and that's when it unraveled.
    via Nov4Z3nith
  • His mom apparently called him later that evening, said she had felt for a while that I seemed distant and wanted to know if she had done somthing wrong.
    via Nov4Z3nith
  • He relayed this to me and then said I had "made her feel bad" by pulling back.
    via Nov4Z3nith
  • I don't know how she knew since I never spoke to her about any of this, which means he told her himself, and now the whole thing has somehow shifted from my actuall need for personal time to managing her feelings about my absence.
    via Nov4Z3nith
  • I'm not trying to disappear from his family. I just want my weekends back. AITJ?
    via Nov4Z3nith
  • A man and his father grill together in the backyard while other family members chat and spend time nearby.
  • TheMarkMatthews I think you've probably outgrown this mummy's boy. If you don't have kids to worry about then maybe just make a clean break. Go enjoy your life while you are still young. He seems ready for old age already. Or if it's possible make him visit your parents every other weekend see how he likes it
    via Nov4Z3nith
  • Odd-End-1405 Momma's Boy needs to cut the apron strings! It is NOT normal to spend every weekend at mommy and daddy's. Stop going. Period. He has a choice, one weekend a month, at most, at mommy and daddy's or he goes alone and you continue with your grown up life which will not not bode well for your marriage as you grow and he does not. He needs to understand that he is MARRIED and it is time for you both to make YOUR lives, not continue in a path that continues his childhood. BTW....I get, Fr
    via Nov4Z3nith
  • Due-Aioli-959 You are in a relationship with a manchild who needs his mommy. Move on, this is never going to change.
    via Nov4Z3nith
  • Sad Researcher_781 Once a month is even a lot! I do not know many adults who have the time or inclination to spend an entire weekend a month at their parents' house. Also, OP needs to get ahold of this before they ever think about having kids. That is a nightmare waiting to happen.
    via Nov4Z3nith
  • rateNico The mom finding out means he went and told her, which means he's outsourcing the emotional pressure to someone she can't really push back against. That's not an accident, that's a move.
    via Nov4Z3nith
  • GrapeGatsby23 He went and tattled to his mommy. Also, start making plans in your location to explore those things. And then do them.
    via Nov4Z3nith
  • Moon_6Quil NTA. You did the adult thing and brought it up before you got bitter. Instead of meeting you halfway, he let his mom get drafted into it and now acts like your free time is some kind of family referendum. That would bug me too.
    via Nov4Z3nith
  • Phantom_Rogue2 NTA. Forty out of fifty two weekends is not "dropping by family", that is basically unpaid residency with a Sunday checkout. You asked for balance, not exile. The part where his mom got involved would make me dig my heels in too.
    via Nov4Z3nith
  • SinfulObey Sit him down and address the triangulation. "When you told your mom I was 'pulling back' instead of explaining that we need time as a couple, you made me the villain. I'm not 'distant'; I'm an adult with a life. From now on, I will be visiting once a month. I need you to support that boundary without making it about her being 'hurt."
    via Nov4Z3nith
  • 9ArcBeryl7 NTA. Wanting two adult days that don't automatically belong to his parents is pretty normal. The weird part is him turning your schedule into a group family issue.
    via Nov4Z3nith

Tags

Scroll Down For The Next Article