Woman books 4 bedroom Airbnb for girls' trip, friend invites herself and gets offended when told to book alternative accommodation: 'I'm a grown woman who needs her space'

Advertisement
  • A stack of folded white towels sitting on the end of a bed
  • My friend invited herself to my vacation and I won't let her stay with me

    Everyone involved is in their early 40s F. I recently got divorced and it has been very rough going. I went to therapy and it helped me tremendously. I am finally starting to feel like my old self. I got off of my rusty-dusty as my grandma would say, hit the gym, reconnected with my friends, I feel good again. My ex and I
  • used to take frequent vacations, which I enjoyed. There is no reason for me to stop now. So I decided to organize a trip with my friends. I asked five of my friends if they wanted to go and three said yes. Diane was one of the ones who said no as she already scheduled a few vacations and had limited time available. No problem.
    via Significant_Break316
  • So I researched and found a four bedroom Airbnb. Everyone will have their own room. One friend and I each have the master rooms (one bed in each room) and the other two friends each have a double room (two separate beds in each room). Everything is set, flights are booked, it's one month away, we're excited!
    via Significant_Break316
  • And that brings us to this weekend. Diane called me and said one of her trips fell through and she now has availability to go with us on our trip. Great! I told her that our host has multiple properties, I'll ask her if she has another one near ours or if she can recommend a hotel that is close to us. Diane got upset and asked why can't
    via Significant_Break316
  • Three women run barefoot across a beach, towards the sea
  • she stay with us. I told her all rooms are taken. She knows this, I was telling her about the trip all along. She then asked why can't I switch rooms with one of my friends, and she and I share a double room. I told her that I didn't want to.
    via Significant_Break316
  • Now, call me selfish, call me mean, call me whatever, but make sure to add that I'm a grown a woman who needs her space. I just spent 12 years sharing a room with my ex, I've happily adjusted to being alone. The other ladies are rarely away from their husbands and kids so they want their space as well. From the very beginning the decision
    via Significant_Break316
  • was that everyone would have their own room. I explained this to Diane. She doesn't get it or doesn't want to get it. She then called my friends (she is friends with them through me) who are going on the trip to see if they will share with her. They all said no and suggested that she get an Airbnb or hotel near us and we'll all hang out together.
    via Significant_Break316
  • I just want to state we all are professional women who make good money, so money isn't the issue here. Diane often travels solo because she doesn't want to negotiate with anyone (her words). She had her own room on the group trip that fell apart. We are not suggesting anything that she has not done previously.
    via Significant_Break316
  • So now she isn't talking to any of us. I feel bad that I don't feel bad as much as I should. I've been through enough in the last year, I've just learned how to handle my feelings again, I can't manage hers as well. She knew we had finalized this trip, she knows everyone is looking to get away for their own reasons. We don't want drama and she is bringing it to us. AITA for not accommodating her?
    via Significant_Break316
  • Three female friends put their arms around one another as they walk barefoot across a beach
  • Foreign_Tap_5782 NTA. She said no, she doesn't now get to inconvenience anyone else because her plans fell through.
    via Foreign_Tap_5782
  • Significant_Break316 Original Poster's Reply That is how I'm feeling. We are her second choice and she wants us to scramble to accommodate her.
    via Significant_Break316
  • GenoFlower NTA. I get it. I love traveling, and I'm a woman who needs my space. I can share a room if I go into knowing I'm going to share a room, but after all you've been through, and how this trip was planned, nope. It's too bad Diane's other trip fell through, but it was planned out this way for a reason. Have fun!!
    via GenoFlower
  • MrLizardBusiness NTA- she said no, then got FOMO and wanted to come. It's not that she wasn't invited, but she turned it down when you were in the planning stages. Now that things are finalized, she expects everyone to rearrange to accommodate her? Um, no. Sorry. She can either make other arrangements and come hang out, or just skip this trip. No one is being mean here.
    via MrLizardBusiness
  • WasabiPeas2 NTA. I'll be 46 next month and I no longer have time for bulls like this. She initially said no so plans continued without her. Enjoy the silence and your trip.
    via WasabiPeas2
  • Agile_Menu_9776 I can see why she often travels by herself as she wants things her way and if she doesn't get her way she becomes nasty. I would take her not talking to you as a plus and let this "friendship" di a natural death.
    via Agile_Menu_9776
  • Significant_Break316 Original Poster's Reply This is it. She likes things her way which is why sharing a room with her would not be relaxing.
    via Significant_Break316
  • Rare_Sugar_7927 NTA. Youre plans were set. Fine that she asked you, slightly less fine she then went and asked the others, but ok. What's not ok is that she cant take no for an answer graciously. Sure it s ks for her that she cant go, I've been in that position of being left behind plenty before, but sulking about it and giving people the silent treatment is incredibly immature.
    via Rare_Sugar_7927
  • HotCode4423 NTA, as a male I felt part of my wife in you saying how all your ladies were looking forward to their own space, even just for a short while. Hope the trip is great.
    via HotCode4423
  • cckka That might be fine if they were 20, but in your 40's you don't want to have to tiptoe around someone sleeping in the living area and having their bags everywhere.
    via cckka

Tags

Scroll Down For The Next Article